Condo
Noman Elevator
Noman Elevator

The Construction Industry is Experiencing

The construction industry is experiencing a dynamic and transformative period of growth.

/
/
/
/
/
/
/
/
/

Material Sourcing & Pre-Installation Prep – Noman Elevators Complete Process

Core Components: T-9 guide rails (5mm thick, EN81), VVVF gearless motors, PMSM drives.

Sharif Mill Approved Vendors: ISO-9001 certified for Lahore seismic standards.

Local Sourcing: Misri Shah steel suppliers (S355 grade), Shalimar electrical contractors

Material Specification & Ordering

Rails: T-9/T-10, 1200mm bracket spacing, laser-straight tolerance 1:1000

Motors: 30% energy saving PMSM, 20kW peak load, 415V 3-phase

Controls: CAN-bus microprocessor, 20+ safety circuits, ARD rescue device

Cabs: SS304 mirror finish, panoramic glass (8-12mm tempered)

Factory Acceptance Testing (FAT)

Rails: Load deflection test (2x rated capacity)

Motors: No-load run 24hrs, torque verification

Controls: Safety chain test (20 circuits), door synchronization

Cabs: Drop test simulation, finish inspection

Secure Delivery & Storage

Transport: Sharif Mill flatbed to 17 Raheem Road (2-day transit)

On-site Storage: Tarped, elevated pallets, security fencing

Inventory: RFID tagged components, digital checklist

Pre-install Inspection: All certs verified before unloading

Key Deliverables

Components arrive Misri Shah ready for Step 4 – zero field procurement delays, guaranteed Sharif Mill quality.

Quality Assurance Deliverables

Sharif Mill components arrive 17 Raheem Road installation-ready. Zero field procurement delays. Guaranteed quality for Shalimar commercial projects.

Frequently Asked Questions

What Sharif Mill components do you source?
:T-9 guide rails (5mm), VVVF gearless motors (20kW), SS304 mirror cabs, CAN-bus controllers, ARD rescue devices, hydraulic buffers
Are materials ISO certified?
Yes, all Sharif Mill components carry EN81/PES compliance certificates. Lahore seismic certification mandatory.
How do you verify material quality?
Factory Acceptance Testing (FAT): Rails load tested 2x capacity, motors run 24hrs no-load, controls test 20+ safety circuits.
What site preparation is needed before delivery?
Pit (1400mm depth), fire-rated shaft walls, 3-phase 415V conduits, 3400mm overhead clearance, laser plumb verification 1:1000.
How are components transported to Misri Shah?
Sharif Mill flatbed trucks (2-day transit), RFID tagged crates, secure tarped storage at 17 Raheem Road warehouse.

Collaborating closely with clients, we deliver Sharif Mill elevators engineered for lifelong performance.

Contact Noman Elevators Today

    Stay connected with us on social media for real-time project reveals, installation hacks, and exclusive Lahore lift updates.

      Cart (0 items)