Condo
Noman Elevator
Noman Elevator

The Construction Industry is Experiencing

The construction industry is experiencing a dynamic and transformative period of growth.

/
/
/
/
/
/
/
/
/

Professional Installation by Noman Elevators ensures precision and safety.

Noman Elevators delivers expert installation using certified Sharif Mill technicians at our 17 Raheem Road facility in Misri Shah, Lahore. We follow a 7-step process with 1:1000 rail alignment tolerance, VVVF gearless systems (up to 1.75m/s), and full compliance to Pakistani building codes for passenger, cargo, and hospital lifts (450-1600kg capacity).

Key Installation Features

Expert Elevator Construction Solutions

Elevator construction demands precision engineering and certified craftsmanship. At Noman Elevators, our Sharif Mill-trained experts deliver commercial and residential installations that meet Pakistani building codes while exceeding client expectations for safety, speed, and reliability.

Precision Engineering Solutions

Complete Elevator Lifecycle Management
From 17 Raheem Road site assessment to Misri Shah handover, we provide turnkey solutions for passenger (450kg), cargo, and hospital lifts (1600kg). Every project features VVVF gearless technology, SS304 cabs, and 95% uptime guarantees.

Core Technical Services

Accurate shaft drawings (1500x1500mm min)
Accurate drawing involves creating precise and detailed visual representations
Individual load engineering (1:1000 rail tolerance)
Individual planning involves creating personaliz strategies and schedules tailored
Pit & foundation calculations (1400mm depth)
Pit calculation involves determining the dimen sion, volume, and structural
Installation quality control
Elevation control involves monitoring and managing project progress

20+ Years Lahore Experience

Lightweight Steel Precision Structures
T-9 guide rails (5mm thick) deliver aircraft-grade strength-to-weight ratio. VVVF motors (20kW) use permanent magnet technology for 30% energy savings. SS304 stainless construction resists corrosion in humid Lahore conditions.

Proven Project Benefits

By ordering the installation services from us, we can be sure of the quality of materials and installation.

Recent Shalimar Colony Projects

7-stop passenger lift (1000kg, 1.75m/s)

Hospital service lift (1600kg, ARD rescue)

Cargo freight lift (duplex operation)

 

Frequently Asked Questions

How long until my elevator operates?
8-12 weeks from laser site survey to training handover.
What safety testing occurs?
100 no-load cycles, 125% overload, governor drops - all documented.

Do you serve Lahore suburbs?
Yes - Misri Shah HQ provides 2-hour response across Shalimar, Gulberg, DHA.

We Work with Clients to Create Solutions that Stand the Test of Time.

Reach Out for Expert Construction Service Solutions

    Stay connected with us on social media for real-time project reveals, installation hacks, and exclusive Lahore lift updates.

      Cart (0 items)