Noman Elevators

Noman Elevators: Lahore’s Unstoppable Force.

Noman Noshahi Traders drives this evolution with top-tier passenger/cargo elevators, branded hoists, T-9 rails, and VVVF precision—20+ years elevating Misri Shah sites to DHA masterpieces.

Material Sourcing & Pre-Installation Prep – Noman Elevators Complete Process

Core Components: T-9 guide rails (5mm thick, EN81), VVVF gearless motors, PMSM drives.

Sharif Mill Approved Vendors: ISO-9001 certified for Lahore seismic standards.

Local Sourcing: Misri Shah steel suppliers (S355 grade), Shalimar electrical contractors

Material Specification & Ordering

Rails: T-9/T-10, 1200mm bracket spacing, laser-straight tolerance 1:1000

Motors: 30% energy saving PMSM, 20kW peak load, 415V 3-phase

Controls: CAN-bus microprocessor, 20+ safety circuits, ARD rescue device

Cabs: SS304 mirror finish, panoramic glass (8-12mm tempered)

Factory Acceptance Testing (FAT)

Rails: Load deflection test (2x rated capacity)

Motors: No-load run 24hrs, torque verification

Controls: Safety chain test (20 circuits), door synchronization

Cabs: Drop test simulation, finish inspection

Secure Delivery & Storage

Transport: Sharif Mill flatbed to 17 Raheem Road (2-day transit)

On-site Storage: Tarped, elevated pallets, security fencing

Inventory: RFID tagged components, digital checklist

Pre-install Inspection: All certs verified before unloading

Key Deliverables

Components arrive Misri Shah ready for Step 4 – zero field procurement delays, guaranteed Sharif Mill quality.

Quality Assurance Deliverables

Sharif Mill components arrive 17 Raheem Road installation-ready. Zero field procurement delays. Guaranteed quality for Shalimar commercial projects.

Frequently Asked Questions

What Sharif Mill components do you source?
:T-9 guide rails (5mm), VVVF gearless motors (20kW), SS304 mirror cabs, CAN-bus controllers, ARD rescue devices, hydraulic buffers
Are materials ISO certified?
Yes, all Sharif Mill components carry EN81/PES compliance certificates. Lahore seismic certification mandatory.
How do you verify material quality?
Factory Acceptance Testing (FAT): Rails load tested 2x capacity, motors run 24hrs no-load, controls test 20+ safety circuits.
What site preparation is needed before delivery?
Pit (1400mm depth), fire-rated shaft walls, 3-phase 415V conduits, 3400mm overhead clearance, laser plumb verification 1:1000.
How are components transported to Misri Shah?
Sharif Mill flatbed trucks (2-day transit), RFID tagged crates, secure tarped storage at 17 Raheem Road warehouse.

Contact Noman Elevators Today



    Stay connected with us on social media for real-time project reveals, installation hacks, and exclusive Lahore lift updates.

    Let us help you get your project started.

    Contact us

     +92-313-8080067



      Cart (0 items)