Noman Elevators delivers Rigorous Testing & Commissioning with Sharif Mill precision.
Testing ensures every elevator achieves 95% uptime from Day 1. Our 17 Raheem Road technicians execute comprehensive validation before handover, meeting EN81-20 standards and Pakistani building codes.
Mechanical Performance Tests
Pre-Test Controller Setup
Cycle Initiation (Cycle 1-25)
Door Operation Validation (Cycles 26-50)
Ride Comfort Analysis (Cycles 51-75)
Emergency Stop Verification (Cycles 76-100)
Data Analysis & Reporting
Noman Elevators: Precision Elevator Construction Excellence
Elevator construction requires engineering precision beyond ordinary building work. Noman Elevators delivers turnkey installations from 17 Raheem Road that achieve 95% uptime through Sharif Mill-certified processes.
Advanced Engineering Planning
Shaft & Pit Engineering
Load & Speed Optimization
Code Compliance Matrix
Quality Control & Installation Oversight
20+ Years Misri Shah Mastery
Proven Infrastructure
17 Raheem Road warehouse stocks T-9 rails, VVVF motors, SS304 panels – immediate staging eliminates 8-week lead times competitors face. 100+ Shalimar installations prove execution excellence.
Certified Workforce
Sharif Mill technicians trained on DJ-A laser alignment, FAT testing protocols, 125% overload validation. 24-month warranty backed by 2-hour emergency response SLA.
Technical Authority
Aircraft-grade T-9 rails (5mm thick), permanent magnet VVVF motors (30% energy savings), ARD rescue systems (2hr UPS) – materials selected for Lahore’s humid/seismic environment.
Engineering Advantages
By ordering the installation services from us, we can be sure of the quality of materials and installation.
Portfolio: Shalimar Success Stories
Portfolio: Shalimar Success Stories
Tower Residency (2025)
7-stop passenger lift, 1000kg, 1.75m/s VVVF, glass SS304 cab – handed over Week 11.
Misri Shah Hospital
1600kg service lift, ARD rescue, Phase II fire service – 125% overload passed Week 10.
Gulberg Factory Duplex
2x1000kg cargo lifts, 2m freight doors – synchronized commissioning Week 12.
Frequently Asked Questions
What's included in 8-12 week timeline?
Hospital lift requirements?
Can you modify existing buildings?
Warranty coverage details?
VVVF vs hydraulic comparison?
We Work with Clients to Create Solutions that Stand the Test of Time.
Dianne Russell
Guy Hawkins
Legacy Engineering Partnership
Built for Lahore’s Future
Our Brochures